Permits
Sign Permits in Utah
Utah cities and counties issue sign permits under their own codes, and the sign allowance is often tied to the length of your storefront.
Salt Lake City’s Building Services sign permit application is filed with the sign contractor’s license number and three sets of plans, including site plans, details, elevations and engineering. Its worksheets compute the allowed sign area from the zone’s size ratio and your lot and store frontage. Approval includes zoning, the plans examiner and, where it applies, historic review, and footing inspections are required before installation, with a final inspection for every sign.
The form also states that a separate electrical permit is needed for the feeder or branch circuit wiring to sign equipment, obtained by a licensed electrical contractor, and that any work on public property needs its own permit. A permit or license issued for a sign that conflicts with city ordinances is void, whoever issued it.
| Sign permit | Your city or county |
|---|
| Salt Lake City plans | Three sets: site plan, details, elevations, engineering |
|---|
| Salt Lake City approvals | Zoning, plans examiner and historic review where it applies |
|---|
| Salt Lake City inspections | Footing inspection before installation; final inspection |
|---|
| Salt Lake City electrical | Separate permit by a licensed electrical contractor |
|---|
New to sign permits? Read how sign permits work and what your electrician needs.
Official sources
Rules change. Always confirm with the office that issues your permit before you order.