Permits
Sign Permits in Colorado
Colorado cities and counties issue sign permits under their own codes, and Front Range suburbs and mountain towns each set their own size and lighting limits.
In Denver, Community Planning and Development requires a zoning permit for most signs on private property. The application includes a site plan with dimensions from the sign to the zone lot lines and a fully dimensioned elevation showing the sign on the facade and its height above grade. A building permit is also required for most signs unless the Denver Building and Fire Code exempts them, with structural plans for the framing, supports, connections and anchorage that are prepared, stamped and signed by a Colorado-registered professional structural engineer.
Applications go through Denver’s e-permits system; choosing a building log gets the zoning and building reviews done together. If the building permit isn’t obtained within 180 days of the zoning permit, the zoning permit has to be applied for again. A sign with electrical components needs an electrical permit, one that crosses into the public right-of-way needs a Department of Transportation and Infrastructure permit, and a sign on a landmark or in a historic district goes to Landmark Preservation for a Certificate of Appropriateness.
| Sign permit | Your city or county |
|---|
| Denver zoning | Zoning permit with site plan and dimensioned elevation |
|---|
| Denver building | Structural plans by a Colorado-registered structural engineer |
|---|
| Denver timing | Building permit within 180 days of the zoning permit |
|---|
| Denver lit signs | Electrical permit as well |
|---|
New to sign permits? Read how sign permits work and what your electrician needs.
Official sources
Rules change. Always confirm with the office that issues your permit before you order.