Permits
Electrical and Sign Permits in Montana
State electrical permits are required on all electrical work in Montana except in cities, counties and towns certified to issue their own permits and conduct inspections. The installer or owner applies to the Building Codes Bureau before starting, permits for anything but a homeowner’s own work are pulled by Montana-licensed electrical contractors, and the permit holder calls for rough-in and final inspections.
In Billings, the largest city, the City/County Planning Division’s Zoning Coordinator has issued an official interpretation of the wall sign rules. In most commercial districts the maximum wall sign area is 20 percent of the wall or 250 square feet, and it applies to the entire building frontage facing a street, not tenant by tenant. Applications for new wall signs must show how much wall sign area already exists on that frontage and whether a sign cabinet is being removed or replaced; without that, the application is incomplete.
Older buildings get squeezed: where existing wall signs exceed the maximum by more than 20 percent, no wall signs may be replaced or added, only their faces swapped, while buildings over by 20 percent or less may replace signs like for like in area. Projecting, awning and other attached signs don’t count toward the wall total.
Bozeman requires a building permit, filed through ProjectDox, for new signs and for every revision to an existing one, including a change in copy.
| Electrical permit | State Building Codes Bureau, unless the city or county is certified |
|---|
| Inspections | Rough-in and final |
|---|
| Billings wall signs | 20% of the wall or 250 sq ft in most commercial districts |
|---|
| Billings wall total | Shared by the whole building frontage |
|---|
| Bozeman | Permit for new signs and any copy change |
|---|
New to sign permits? Read how sign permits work and what your electrician needs.
Official sources
Rules change. Always confirm with the office that issues your permit before you order.