Lit channel letters
Built in Washington and California
A new Boston sign goes on a Long-Form permit, while changes to an existing sign use the Short-Form; either way the lit sign’s electrical permit is separate.
Starting at $12.73 $10.82/inch
Not sure what you need? Call 866-436-2101 and we’ll help.
Start BuildingShop
Signs / Letters
Indoor / Outdoor Displays
Banners
Display Hardware
Large Format
Your account
Cart Checkout TR@StorefrontSignOnline.comState guide
Massachusetts businesses can price custom LED channel letters online, have them built in Washington and California, and receive them ready for a Massachusetts-licensed electrician. Banners and window graphics are printed in Renton, WA.
Last reviewed against the official sources linked on this page.
What we ship
The state is clear about who may connect them: the Board of State Examiners of Electricians says only a licensed master or journeyman electrician can legally be hired for electrical work at a home or business. There is no separate sign-only electrical license.
In Boston, a brand-new sign needs a Long-Form permit from Inspectional Services, the electrical permit is pulled separately by a contractor with a Massachusetts trade license, and many storefronts in commercial districts also go through design review.
Built in Washington and California
A new Boston sign goes on a Long-Form permit, while changes to an existing sign use the Short-Form; either way the lit sign’s electrical permit is separate.
Starting at $12.73 $10.82/inch
Made in Renton, WA
Starting at $1.58 $1.34/ft2
Made in Renton, WA
Boston Planning says a new or replacement storefront sign in a commercial area may trigger design review, so plan graphics alongside the sign rather than after it.
Starting at $1.98 $1.68/ft2
Made in Renton, WA
Starting at $11 $9.35/item
Made in Renton, WA
Starting at $269.50 $229.08/item
Popular choices
Lit letters for main streets and city blocks, plus graphics for storefront glass.
Classic lit letters for plazas and main streets.
UL listed5-year warrantyStarting at $12.73 $10.82/inch
A refined halo look for Boston-area boutiques and offices.
UL listed5-year warrantyStarting at $27.36 $23.26/inch
Frosted privacy graphics for street-level offices.
Same-day availableStarting at $9.90 $8.42/ft2
Reusable window promotions for city storefronts.
Same-day availableStarting at $6.05 $5.14/ft2
Who can install it
The board licenses Master (Class A) and Journeyman (Class B) electricians, plus fire warning and security system licenses (Classes C and D) that don’t cover sign wiring. Its consumer fact sheet says only licensed masters or journeymen may legally be hired for electrical work at a home or business. A master can work as an individual, firm or corporation and must keep a regular place of business, and a license type and number must appear on any sign, listing or advertisement for electrical work.
A master license requires at least a year as a licensed Massachusetts journeyman plus 150 hours of instruction, under 237 CMR 13.00. Before work starts, ask to see the electrical permit, and look the license up with the Division of Occupational Licensure.
| Licensing agency | Board of State Examiners of Electricians |
|---|---|
| Master | Class A master electrician |
| Journeyman | Class B journeyman electrician |
| Master prerequisites | 1 year as a Massachusetts journeyman + 150 hours of instruction |
| Advertising | License type and number on any ad or listing |
Rules change. Always confirm with the office that issues your permit before you order.
Permits
Massachusetts cities and towns regulate signs through their own zoning bylaws, and the local building department and wiring inspector issue the building and electrical permits.
Boston’s Inspectional Services Department (ISD) permits all signage against the building and zoning codes; sign zoning sits in Article 11 of the Boston Zoning Code. Work on an existing sign uses a Short-Form permit, and a new sign where none existed before uses a Long-Form permit. Long-Form applications pay a $50 application fee plus $10 for every $1,000 of estimated cost, and the applicant, not ISD, gathers outside approvals such as Landmarks Commission sign-off in a historic district. Starting work before the permit is issued can mean paying double the permit cost or a code violation.
Wiring for the sign needs its own electrical permit, which only a contractor holding a valid Massachusetts trade license can apply for.
| Sign permit | Your city or town building department |
|---|---|
| Boston existing sign | ISD Short-Form permit |
| Boston new sign | ISD Long-Form permit ($50 + $10 per $1,000 of cost) |
| Boston zoning | Article 11, Boston Zoning Code |
| Boston electrical | Separate permit by a Massachusetts-licensed contractor |
New to sign permits? Read how sign permits work and what your electrician needs.
Rules change. Always confirm with the office that issues your permit before you order.
Weather
Massachusetts winters bring nor’easters, wet heavy snow and ice dams, and Cape Cod and North Shore storefronts face salt air. Mount letters above where plows and shovels pile snow, and keep raceways and drain holes clear so meltwater doesn’t refreeze inside them.
How it works
Use the channel letter builder or send your logo.
Check it with your landlord and installer.
Letters in WA or CA; the rest in Renton, WA.
Standard shipping takes 3–6 business days in transit; 3-day, 2-day and overnight shipping are available at checkout. Shipping options.
With our wiring diagram and install pattern (overview). Permit checklist.
On every channel letter style (details).
We build and ship; a local pro installs. A licensed sign installer or electrician in Massachusetts mounts and connects your sign. We don’t have an office or installation crew in Massachusetts, and orders can’t be picked up.
Questions
We ship custom channel letters anywhere in Massachusetts, built in Washington and California and tested before they ship. We don’t install, so you’ll hire a Massachusetts-licensed electrician or sign contractor to mount and connect them.
A licensed master (Class A) or journeyman (Class B) electrician. The state says only licensed masters or journeymen may legally be hired for electrical work at a business, and there is no sign-only electrical license. The board also requires the license type and number on any advertisement for electrical work.
A Long-Form permit from Inspectional Services, since it’s a new sign where none existed. Changes to an existing sign use the Short-Form. The electrical permit is separate and filed by a Massachusetts-licensed contractor. A Long-Form application costs $50 plus $10 for every $1,000 of estimated cost.
The city warns that starting work before the permit is issued can mean paying double the permit cost or getting a code violation, so wait for the Long-Form permit, and any Landmarks or design review approval, before installation day. The applicant, not ISD, collects those outside approvals.
Standard shipping takes 3–6 business days in transit, with 3-day, 2-day and overnight options. Checkout shows the estimated date for each, including production.
Keep reading
Send a storefront photo, your logo and the size and lighting limits confirmed by your landlord or installer. We can suggest options and give you a price before you order.