Permits
Inspections and Sign Permits in Delaware
All electrical work in Delaware, unless specifically exempt, needs a certificate of inspection from a Board-licensed inspection agency (24 Del. C. § 1420). A state-licensed electrician files the application with the agency within 5 working days of starting work, the agency inspects within 5 working days, and violations must be corrected within 15 days. No power company may connect current to a property without the agency’s permanent or temporary cut-in card, and DPR publishes the list of licensed agencies.
In Wilmington, City Code § 41-42 requires all new and existing signs to be registered with the Department of Land Use and Planning. The registration is signed by both the sign owner and the owner of the premises, includes a photograph of each sign, and accompanies the permit application for a new sign. The city’s building permit application asks owners to use only tradespeople licensed in the City of Wilmington, and sidewalk or street encroachments need their own permit from Land Use and Planning.
In Dover, a permit is needed to reface, replace or install a sign, with two sets of drawings showing dimensions, square footage and location. The city’s sign guide lists roof signs, billboards and flashing or moving signs as not permitted, and electronic message centers may cover no more than 70 percent of a sign and change no more than once every 8 seconds.
| Electrical inspection | Board-licensed private inspection agency |
|---|
| Filing deadline | Within 5 working days of starting work |
|---|
| Power connection | Only with the agency’s cut-in card |
|---|
| Wilmington | Every sign registered, with owner signatures and photos |
|---|
| Dover | Permit to reface, replace or install; two sets of drawings |
|---|
Design review and special districts in Delaware
- Wilmington historic and conservation districts (Design Review and Preservation Commission) Exterior alterations in the City Historic Districts and Neighborhood Conservation Districts are reviewed by the Design Review and Preservation Commission, and building permits there are issued only for plans the commission has approved; staff may approve simple items administratively.
New to sign permits? Read how sign permits work and what your electrician needs.
Official sources
Rules change. Always confirm with the office that issues your permit before you order.